Hands-on tutorial

Tutorials · Fibre & GPON

How to Design a GPON Splitter Plan for a Building

Plan PON ports, splitter ratios and locations for a hotel, tower or campus building, and check that every ONU has enough optical power.

Intermediate12 min7 steps

Before you start

  • Floor plans with the number of endpoints per floor or room
  • The OLT datasheet: PON ports, maximum split and reach
  • The optical budget class of the OLT and ONU optics

Step by step

  1. Count the endpoints

    List every endpoint that needs an ONU: apartments, hotel rooms, offices, corridor cameras and access points. Add 10–20% for growth.

  2. Choose the split ratio

    Common designs use 1:32 or 1:64 per PON port. A lower split gives each user more bandwidth and more optical margin; a higher split uses fewer OLT ports. Stay within the maximum split on the OLT datasheet.

  3. Choose one- or two-stage splitting

    Single stage: one large splitter per PON port in the main comms room. Two stage: a 1:4 or 1:8 splitter in the riser and 1:8 splitters on each floor. Two-stage designs need less fibre in the riser.

  4. Calculate PON ports

    Divide the endpoints by the split ratio and round up. For example, 400 apartments at 1:32 need 13 PON ports.

    PON ports = ceiling(endpoints / split ratio)
    
  5. Check the optical budget

    Add the losses: about 17 dB for a 1:32 splitter, 0.35 dB per km of fibre at 1310 nm, 0.3 dB per connector and 0.1 dB per splice. The total must stay inside the budget of the optics, with at least 3 dB margin.

  6. Choose ONU types

    Wi-Fi ONUs for apartments and rooms, PoE ONUs for cameras and access points in corridors, and ONUs with voice ports where analogue phones remain.

  7. Document and label

    Label every splitter port and record which ONU serial is behind it. This makes provisioning and troubleshooting much faster.

Commands are generic, industry-standard examples. Exact syntax and menu names vary by model and firmware; check your device's manual on the Documentation page.

Pro tips

  • Leave spare PON ports on the OLT and spare outputs on splitters.
  • Keep splitters in accessible, ventilated cabinets, not above ceilings.
  • Measure optical power at a few ONUs after installation and record the values.