Tutorials · Switching

How to Build an ERPS Ring for Fast Failover

Configure ITU-T G.8032 ERPS on industrial switches so a fibre cut reroutes traffic in milliseconds.

Advanced18 min5 steps

Before you start

  • Switches with ERPS support (check the datasheet)
  • A physical ring of fibre or copper links
  • A dedicated control VLAN

Step by step

  1. Draw the ring

    List every switch and the two ring ports on each. Pick one switch as the RPL owner.

  2. Create the control VLAN

    ERPS messages (R-APS) travel in their own VLAN.

    vlan 4000
     name ERPS-CONTROL
    
  3. Define the ring and instance

    Set east and west ports on every switch.

    erps ring 1
     port0 tengigabitEthernet 0/1
     port1 tengigabitEthernet 0/2
     instance 1
      control-vlan 4000
      protected-vlan 10,20,30
    
  4. Set the RPL owner

    On one switch, mark one ring port as the Ring Protection Link, which stays blocked in normal operation.

    erps ring 1 instance 1
     rpl owner port1
    
  5. Test failover

    Disconnect a ring link and watch traffic continue. Reconnect it and confirm the RPL blocks again.

    show erps
    

Commands are generic, industry-standard examples. Exact syntax and menu names vary by model and firmware; check your device's manual on the Documentation page.

Pro tips

  • Route the two halves of the ring through physically different paths.
  • Monitor ring state with SNMP traps so a failure is never silent.
How to Build an ERPS Ring for Fast Failover | Navijin Tutorials