Tutorials · Switching

How to Stack Switches for Simpler Management and Resilience

Combine several stackable switches into one logical switch: cabling, member priorities, cross-stack link aggregation and safe upgrades.

Intermediate15 min6 steps

Before you start

  • Stackable switches of the same family (check datasheets)
  • Stacking cables or ports as specified

Step by step

  1. Check compatibility

    Members must be stack-compatible models with the same firmware version.

  2. Plan the topology

    Cable members in a ring (last back to first) so one failed cable does not split the stack.

  3. Set member numbers and priority

    Give the intended master the highest priority so it is elected predictably.

    switch 1 priority 15
    switch 2 priority 14
    
  4. Power on in order

    Boot the intended master first, then the other members, and confirm they join.

    show switch
    
  5. Use cross-stack link aggregation

    Connect uplinks from different members into one LACP bundle, so losing a member does not cut the uplink.

  6. Upgrade carefully

    Upgrade the whole stack in a maintenance window; follow the vendor's stack upgrade procedure.

Commands are generic, industry-standard examples. Exact syntax and menu names vary by model and firmware; check your device's manual on the Documentation page.

Pro tips

  • Label members with their stack number.
  • Keep a spare member pre-configured with the same firmware.
How to Stack Switches for Simpler Management and Resilience | Navijin Tutorials